Our Process

Planning & Design

Planning & Design

  • • Identify purpose (e.g., storage, machinery, livestock)
  • • Choose an appropriate location (drainage, accessibility)
  • • Obtain correct planning permission
  • • Design layout and materials based on function
Site Preparation

Site Preparation

  • • Clear and level the land
  • • Ensure proper drainage to prevent water pooling
  • • Mark the building footprint
Foundation & Flooring

Foundation & Flooring

  • • Foundations are done to a spec
  • • Pour concrete foundations and set holding down bolts.
  • • Allow proper curing time
Framing & Structural Construction

Framing & Structural Construction

  • • Erect steel frame
Roofing & Wall Installation

Roofing & Wall Installation

  • • Install roofing materials (fibre cement, composite, single skin)
  • • Side cladding (composite, single skin, Yorkshire boarding)
Doors, Windows & Ventilation

Doors, Windows & Ventilation

  • • Roller shutter doors
  • • Sliding doors
  • • Pedestrian doors
  • • Install Louvres as specified
Electrical & Plumbing (If Needed)

Electrical & Plumbing (If Needed)

  • • Run electrical wiring for lighting and power outlets
  • • Install water supply and drainage for livestock or cleaning
  • • including 3 phase for roller doors if required
Interior & Finishing Touches

Interior & Finishing Touches

  • • Grain wall partitions
  • • Internal dividing walls
  • • Bird proofing and weatherproofing
To top